The project of stationary sources of air pollution permission and management in 2012 and 2013.

Absrtact
"The Stationary Source Permitting and Management Plan (SSPMP)" of Kaohsiung City was executed from 2012 to 2013 by year. SSPMP includes assisting the implementation of the EPA stationary source within the jurisdiction of Kaohsiung permit application review, executive the license audit operation, emissions reporting audit work, flue supervision and inspection inspections, database update maintenance etc. The work in 2012 was completed before the end of December in the same year. We finished 1044 permit application review, issuance 868 permits. To fit the EPA's requirement to review the above case holding 7 (9 process) permit review. On field duty, we've completed 1170 licenses check operation on site, 425 executive the license audit operation, 673 flue supervision, 12 equipment components inspections, 85 field perimeter inspections , 20 PSN audits and inspections , 30 oil sulfur content analysis , 5 perimeter noise detection, 165 public and private premises regularly monitored detecting, extended maintenance of database update for 1214 processes etc. In addition, we also completed three guidance meeting, 2 field technology transfer conference, 1 result presentation and all contractual requirements in 2013 have been fully completed. In 2013, there are 1075 permitted factories with 2280 processes in Kaohsiung city. 425 factories of them have to report pollutant emissions by air pollution control act. 155 belong to the first batch and 270 belong to the second batch. There are 964 flue need to regular testing and reporting to EPA among 676 belong to the first batch and 288 belong to the second batch. We recognized 10451.792 metric tons of particulate matters, 37464.415 metric tons of SOx, 45712.898 metric tons of NOx and 17189.427 metric tons of VOC of 2013. In addition to the completion of the project work plan contract in 2013, this project also completed with the EPA completing the first review of greenhouse gas reporting, performed the total amount of regulatory approval trial work in Daihatsu and Dashe industrial zone, coordinated emergency response operations within the jurisdiction of several times, and Integrated database application. For EPA review of stationary sources permits in the future, this project also helped the EPA to review the development of relevant principles in this year. By formulating principles could help permit reviewers"The Stationary Source Permitting and Management Plan (SSPMP)" of Kaohsiung City was executed from 2012 to 2013 by year. SSPMP includes assisting the implementation of the EPA stationary source within the jurisdiction of Kaohsiung permit application review, executive the license audit operation, emissions reporting audit work, flue supervision and inspection inspections, database update maintenance etc. The work in 2012 was completed before the end of December in the same year. We finished 1044 permit application review, issuance 868 permits. To fit the EPA's requirement to review the above case holding 7 (9 process) permit review. On field duty, we've completed 1170 licenses check operation on site, 425 executive the license audit operation, 673 flue supervision, 12 equipment components inspections, 85 field perimeter inspections , 20 PSN audits and inspections , 30 oil sulfur content analysis , 5 perimeter noise detection, 165 public and private premises regularly monitored detecting, extended maintenance of database update for 1214 processes etc. In addition, we also completed three guidance meeting, 2 field technology transfer conference, 1 result presentation and all contractual requirements in 2013 have been fully completed. In 2013, there are 1075 permitted factories with 2280 processes in Kaohsiung city. 425 factories of them have to report pollutant emissions by air pollution control act. 155 belong to the first batch and 270 belong to the second batch. There are 964 flue need to regular testing and reporting to EPA among 676 belong to the first batch and 288 belong to the second batch. We recognized 10451.792 metric tons of particulate matters, 37464.415 metric tons of SOx, 45712.898 metric tons of NOx and 17189.427 metric tons of VOC of 2013. In addition to the completion of the project work plan contract in 2013, this project also completed with the EPA completing the first review of greenhouse gas reporting, performed the total amount of regulatory approval trial work in Daihatsu and Dashe industrial zone, coordinated emergency response operations within the jurisdiction of several times, and Integrated database application. For EPA review of stationary sources permits in the future, this project also helped the EPA to review the development of relevant principles in this year. By formulating principles could help permit reviewers to follow and reduce the differences caused by different concepts on regulation.
Keyword
permit;air pollution;licenses check operation on site
Open
top